Standard Format Equipment List
Semi-Submersible/Drill Ship Units

NOW OPEN FOR COMMENTS

NEWLY REVISED IADC STANDARD EQUIPMENT LIST FOR FLOATING UNITS NOW OPEN FOR COMMENTS

ATTENTION IADC MEMBERS – The IADC Standard Equipment List has been developed to provide a comprehensive summary of all relevant items of equipment and to streamline the tender process for both contractor and operators.

The last edition of the equipment list was released in 1993, so it is long overdue for a revision. IADC formed a workgroup earlier this year and has now provided a final draft for member review and input. We urge you to work through the document carefully and offer your suggestions/edits/comments.

INSTRUCTIONS

The Standard Format Equipment List has been developed to provide a comprehensive summary of all relevant items of equipment and to streamline the tender process for both contractor and operator. In order to obtain maximum efficiency, users are advised to maintain the precise order of the format and to request/provide any additional information on specific equipment as an addend urn, referring to the appropriate section number.

GENERAL COMMENTS

SECTION A – UNIT SPECIFICATIONS

  • A1 Main Dimensions/Technical Description
  • A2 Storage Capacities
  • A3 Propulsion/Thrusters
  • A4 Operational Capabilities
  • A5 Variable Loading
  • A6 Environmental Limits
  • A7 Mooring System
  • A8 Marine Loading Hoses
  • A9 Cranes, Hoists, and Materials Handling
  • A10 Helicopter Landing Deck
  • A11 Auxiliary Equipment
SECTION B – GENERAL RIG SPECIFICATIONS

  • B1 Derrick and Substructure
  • B2 Drawworks and Associated Equipment
  • B3 Derrick Hoisting Equipment
  • B4 Rotating System
  • B5 Drilling Control System
SECTION C – POWER SUPPLY SYSTEMS

  • C1 Rig Power Plant
  • C2 Emergency Generator
  • C3 Primary Electric Motors
  • C4 Power Management System
  • C5 Main Bus Operation – Configuration
SECTION D – DRILLSTRING EQUIPMENT (1 of 2)

  • D1 Tubulars
SECTION D – DRILLSTRING EQUIPMENT (2 of 2)

  • D2 Handling Tools
  • D3 Fishing Equipment
  • D4 Casing While Drilling System (if applicable)
SECTION E – WELL CONTROL/SUBSEA EQUIPMENT (1 of 3)

  • E1 Lower Riser Diverter Assembly
  • E2 Primary BOP Stack
  • E3 Primary Lower Marine Riser Package
  • E4 Secondary BOP Stack
  • E5 Secondary Lower Marine Riser Package
SECTION E – WELL CONTROL/SUBSEA EQUIPMENT (2 of 3)

  • E6 Primary Marine Riser System
  • E7 Secondary Marine Riser System
  • E8 Diverter BOP
  • E9 Subsea Support System
  • E10 BOP Control System
SECTION E – WELL CONTROL/SUBSEA EQUIPMENT (3 of 3)

  • E11 Subsea Control System
  • E12 Emergency Back-up Systems
  • E13 Subsea Auxiliary Equipment
  • E14 Choke Manifold
  • E15 BOP Testing Equipment
  • E16 Wellhead Running/Retrieving/Testing Tools
SECTION F – MUD SYSTEM/BULK SYSTEM

  • F1 High Pressure Mud System
  • F2 Low Pressure Mud System
  • F3 Bulk System
SECTION G – CASING/CEMENTING EQUIPMENT

  • G1 Casing Equipment
  • G2 Cement Equipment
SECTION H – INSTRUMENTATION/COMMUNICATION

  • H1 Drilling Instrumentation at Driller’s Position
  • H2 Drilling Parameter Recorder
  • H3 Instrumentation at Choke Manifold
  • H4 Instrumentation at Standpipe
  • H5 Survey Equipment
  • H6 Rig Communication System
  • H7 Environmental Instrumentation
  • H8 Additional MODU Specific Instrumentation
  • H9 Global Maritime Distress and Safety System (GMDSS)
SECTION I – PRODUCTION TEST EQUIPMENT

  • I1 Burners
  • I2 Burner Booms
  • I3 Lines Required on Burner Booms
  • I4 Sprinkler System
  • I5 Fixed Lines for Well Tesing
  • I6 Auxiliary Power Availability
  • I7 Floating Storage and Offload System
SECTION J – RISERLESS DRILLING, INTERVENTION AND WORKOVER SYSTEMS

SECTION K – ACCOMMODATION

  • K1 Offices
  • K2 Living Quarters
SECTION L – SAFETY EQUIPMENT

  • L1 General Safety Equipment
  • L2 Gas/Fire/Smoke Detection
  • L3 Fire Fighting Equipment
  • L4 Breathing Apparatus
  • L5 Emergency First Aid Equipment
  • L6 Helideck Rescue Equipment
  • L7 Rig Safety Store
  • L8 Emergency Warning Alarms
  • L9 Survival Equipment
SECTION M – POLLUTION PREVENTION EQUIPMENT

  • M1 Sewage Treatment
  • M2 Garbage Compaction
  • M3 Garbage Disposal/Grinder
  • M4 Deck Drainage (Fully Contained Main Deck)
  • M5 Dedicated Oily Water Separator
SECTION N – MPD (MANAGED PRESSURE DRILLING) / UBO (UNDERBALANCED OPERATION)

  • N1 Surface Equipment
  • N2 Subsea Equipment
SECTION O – ROV (REMOTELY OPERATED VEHICLE)

  • O1 General
  • O2 Vehicle
  • O3 Television System
  • O4 Tether Management System (TMS)
  • O5 Umbilical
  • O6 Umbilical Win
  • O7 Handling System
  • O8 Control Cabin/Control Room
  • O9 Hydraulic Power System
  • O10 Electro-Hydraulic Interface for Tooling
  • O11 Equipment
  • O12 Auxiliary Power Pack/Clean Power Unit
SECTION P – CUTTING DRYER / STORAGE / TRANSFER SYSTEM

  • P1 General
  • P2 Equipment
  • P3 Storage
  • P4 Safety Equipment
  • P5 Slop Unit
  • P6 Redundancies
SECTION Q – WIRED PIPE EQUIPMENT

  • Q1 Wired Pipe
  • Q2 Surface System
SECTION R – CAPPING OPERATION (BLOW OUT COLLECTOR)

  • R1 Surface Equipment
NOTE: This form is a suggested guide only and use of this form or any variation thereof shall be at the sole discretion and risk of the user parties. It should be noted that the presence or absence of any equipment does not imply applicability of such equipment for a particular drilling project. The International Association of Drilling Contractors disclaim any liability whatsoever for loss or damages which may result from use of the form or portions or variations thereof.